Research of leaching process and design of leaching equipment for NdFeB waste |
HUANG Wei-ling,WANG Zhong-feng |
Faculty of Applied Science, Jiang’xi University of Science and Technology, Ganzhou 341000, China |
|
|
Abstract Since the low automation degree for retrieving rare earths from NdFeB waste and the large fluctuation of product purity at present, it is difficult to ensure safety of production process and running reliability, leading to low recovery index of rare earth. Recycling of rare earths from NdFeB waste relying on hydrochloric priority dissolution method was conducted. The purification process that greatly influences the rare earth leaching loss was experimentally studied, and the technical measures to improve the leaching rate were summarized. The NdFeB waste leaching process was also studied, and finally the extraction equipment was designed. The purity of rare earth recovery is stabilized, the recovery rate is improved, and the production cost is reduced, which has positive signification for automation and green production of NdFeB waste leaching process.
|
Received: 06 April 2016
Published: 15 December 2016
|
|
|
|
[1] 林河成. 稀土永磁材料的生产应用及市场[J]. 四川有色金属,2010(3):1~9[2] 王素玲, 王毅军. 从废铁合金中回收稀土的研究生产[J]. 稀有金属与硬质合金,2009, Vol. 37(2):26-46[3] 徐光宪. 稀土(上)[M]. 北京:冶金工业出版社,1995. 4[4] 唐谟堂,曹刿. 湿法冶金设备[M]. 长沙:中南大学出版社,2004. 5[5] 陈家镛. 湿法冶金手册[M]. 北京:冶金工业出版社,2005.9 |
|
|
|